MCC Replacement · Bulletin 2100 · Los Angeles

Allen-Bradley MCC Replacement
Los Angeles

Aging MCCs increase arc flash risk, drive nuisance trips, and eventually fail at the worst possible time. MCC replacement is a planned project — not something you want to do as an emergency.

Fixed-price proposals
On-site SoCal
Studio 5000 certified

Request a Quote

Same-day response. Describe your project — we’ll schedule a walkdown and deliver a fixed-price proposal.

The Project

Allen-Bradley MCC Replacement

Direct Source designs and installs Allen-Bradley motor control center replacements for manufacturing, food processing, cold storage, and industrial facilities across Los Angeles. We handle the full project: new MCC specification and procurement, panel and power system coordination, installation, wiring, startup, and arc flash study coordination.

MCC Specification & Procurement

We specify your replacement Allen-Bradley Bulletin 2100 MCC based on your motor list, load schedule, and existing distribution — full lineup design, bucket schedule, and factory order through Rockwell Automation.

We specify what you actually need. Not oversized, not undersized.

Removal & Installation

Planned removal of existing MCC during scheduled outage window: breaker transfer or open, disconnect, remove, position new MCC, land power feeders, reconnect branch circuits, and re-energize systematically.

Power feed coordination with your utility or facility distribution team is part of our scope.

Bucket & Component Replacement

Don’t need a full MCC replacement? We replace individual Allen-Bradley MCC buckets — starter buckets, drive buckets, breaker sections — without replacing the entire lineup.

Bucket replacement is a cost-effective option when the MCC structure is sound but individual components have failed or are obsolete.

Arc Flash Upgrade

MCC replacement projects often include arc flash mitigation: current-limiting fuses, zone-selective interlocking, arc flash energy reduction maintenance mode, and proper labeling for NFPA 70E compliance.

We coordinate arc flash study updates with qualified engineers when the new MCC changes the arc flash incident energy at existing equipment.

NEMA 4X & Washdown MCC

Stainless steel NEMA 4X MCC for food processing, beverage, and washdown environments. Fully gasketed, washdown-rated, configured for your specific application.

Food processing MCC replacement requires different materials and installation methods than standard manufacturing.

Startup & Motor Checkout

Systematic motor-by-motor startup after MCC installation: meggering, rotation check, no-load run, and load verification for every motor reconnected to the new MCC.

We do not energize the new MCC and walk away — we check every motor before declaring the project complete.

Why Direct Source

What Makes Our Approach Different

Fixed-price MCC projects

MCC replacement is a large project — you need to know the cost before you approve it. We provide fixed-price proposals for MCC replacement projects after a site walkdown and existing panel review.

We coordinate the full project

Rockwell factory order, delivery coordination, power shutdown scheduling, installation, wiring, startup — one contractor managing the full scope. You do not juggle a panel shop, an electrician, and a startup contractor.

Los Angeles industrial experience

We have replaced MCCs in food processing, cold storage, manufacturing, and industrial facilities across the LA Basin. We know the access challenges, shutdown coordination requirements, and inspection requirements in LA County.

Emergency bucket replacement

If an MCC bucket fails, we respond fast. We carry common Allen-Bradley replacement buckets and components for emergency response — not just planned replacement projects.

Every Project Includes

  • Site walkdown before proposal
  • Fixed-price project proposal
  • Hardware specification & procurement coordination
  • On-site installation and startup
  • As-built documentation package
  • Post-startup support

Serving: Los Angeles, Vernon, City of Industry, Long Beach, Torrance, Carson, Compton, Gardena, and all LA Basin industrial facilities.

FAQ

Frequently Asked Questions

How long does an MCC replacement take?

A single-section MCC replacement typically takes 1–3 days for installation and startup. Larger multi-section lineups take longer. The majority of the project time is preparation — specification, procurement, and pre-staging. The actual installation and startup window is minimized with proper planning.

Do we have to replace the entire MCC or can we replace individual buckets?

Both options are available. Individual bucket replacement (starter buckets, drive buckets, breaker sections) is cost-effective when the MCC structure is sound. Full MCC replacement makes sense when the lineup is aging, the bus structure is deteriorated, or you need to increase capacity or add sections.

What is a Bulletin 2100 MCC?

Bulletin 2100 is Allen-Bradley’s NEMA-rated motor control center product line — the standard full-voltage and reduced-voltage motor starter MCC lineup. Bulletin 2500 is the low-voltage switchgear line. We work on both, as well as older Bulletin 2100 lineups from previous decades.

Do you coordinate the arc flash study when replacing an MCC?

MCC replacement often changes the arc flash incident energy at the equipment. We coordinate with qualified arc flash study engineers to ensure the new MCC’s protection coordination is properly documented and equipment is labeled correctly after replacement.

What does MCC replacement cost in Los Angeles?

MCC replacement costs vary significantly based on size, number of sections, bucket count, and site conditions. Single-section replacements typically range from $30,000 to $80,000. Full multi-section lineups can range from $100,000 to $500,000 or more. We provide fixed-price proposals.

Get Started

Request a Project Quote

  • Fixed-price proposal after site walkdown
  • On-site throughout the project
  • All hardware sourcing coordinated
  • Full documentation at completion

Call (562) 396-9924

Tell Us About Your Project

We respond same day.

Ready to Get Started?

Fixed-price proposal. On-site Southern California. Call or submit the form — we respond same day.