Manufacturing · MCC Replacement · Los Angeles

Manufacturing MCC Replacement
Los Angeles

Los Angeles manufacturing facilities — food production, metal fabrication, plastics, assembly — run aging Allen-Bradley MCCs that were installed during the 1990s and early 2000s. Deteriorated bus connections, unavailable replacement buckets, and arc flash hazard levels that exceed current PPE requirements are not theoretical risks. They are conditions in the field right now.

Fixed-price proposals
ISNetworld certified
On-site SoCal

Request a Quote

Same-day response. Describe your project — we’ll schedule a walkdown and deliver a fixed-price proposal.

The Project

Manufacturing MCC Replacement — Los Angeles

Direct Source designs and installs Allen-Bradley motor control center replacements for manufacturing facilities across Los Angeles. We handle the complete project — MCC specification and procurement, power system coordination, removal of existing lineup, installation and wiring of new MCC, VFD integration, arc flash mitigation, startup, and documentation. Fixed-price proposals after a site walkdown.

Full Lineup Replacement

Complete Allen-Bradley Bulletin 2100 MCC replacement: new lineup specification, factory order, delivery coordination, removal of existing lineup during scheduled outage, installation, feeder reconnection, and startup. All phases managed by one contractor.

We coordinate the power shutdown schedule with your facility and utility — not your responsibility to figure out.

Production Line MCC Replacement

MCC replacement for production lines: conveyor drives, press controls, HVAC, compressed air, and utility motor control. Line-by-line motor checkout and startup verification after new MCC installation.

Motor-by-motor checkout confirms every load is operating correctly before we close the project.

PowerFlex VFD Integration

Allen-Bradley PowerFlex VFD buckets integrated into the new MCC lineup — drive sizing, harmonic analysis, bypass contactor design, and EtherNet/IP configuration to your ControlLogix or CompactLogix PLC.

New MCC installations are the right time to add MCC-mounted drives and eliminate wall-mounted enclosures.

Arc Flash Mitigation

Current-limiting fuse design, zone-selective interlocking, maintenance mode switches, and arc flash incident energy analysis for the new MCC. NFPA 70E compliant labeling and coordination study update.

New MCC installations often achieve significantly lower incident energy levels than the equipment they replace — we document this.

NEMA 4 & Type 12 MCC

NEMA 4 and Type 12 MCC options for manufacturing environments with water, oil mist, or dust. Proper enclosure selection for your specific facility conditions — not just whatever is cheapest.

Specifying the wrong NEMA type in a manufacturing environment leads to early corrosion and component failure.

Smart MCC & EtherNet/IP

E300 electronic overload relays with EtherNet/IP communication, remote monitoring of motor current, temperature, and fault data from your PLC or SCADA. Motor health monitoring without opening the MCC door.

Smart MCC communication pays for itself in reduced maintenance labor and early fault detection.

Why Direct Source

What Makes Our Approach Different

Los Angeles manufacturing experience

We have replaced MCCs in food processing, metal fabrication, plastics, assembly, and distribution facilities across Los Angeles. We know the access challenges, production scheduling requirements, and inspection process in LA County.

Fixed-price MCC projects

MCC replacement is a major capital project. Fixed-price proposals let you budget and approve with confidence — no open-ended billing that grows as the project progresses.

Minimum production impact

We pre-stage and pre-test the new MCC before the cutover window. Motor reconnection and startup proceed systematically during the planned outage window — not dragged across multiple unplanned days.

VFD integration included

If your manufacturing line needs VFD-controlled motors, we integrate PowerFlex drives into the new MCC lineup as part of the replacement project — not as a separate project that follows later.

Every Project Includes

  • Full lineup specification & procurement
  • Power shutdown coordination
  • Motor-by-motor startup checkout
  • PowerFlex VFD integration
  • Arc flash study coordination
  • As-built documentation package

Serving: Vernon, City of Industry, Compton, El Monte, Downey, Torrance, Long Beach, Carson, and all Los Angeles Basin manufacturing facilities.

FAQ

Frequently Asked Questions

How do you minimize production downtime during MCC replacement?

The key is preparation. We specify and procure the new MCC, pre-stage it in our shop, pre-test every bucket, and prepare all reconnection details before the cutover window. The cutover involves: shut down production, de-energize old MCC, move old MCC, position new MCC, land feeders, reconnect branch circuits, energize systematically, and start up motor by motor. With proper preparation, most single-section MCC replacements cut over in one 10–12 hour planned shift.

Can you add VFDs to motors that are currently across-the-line started?

Yes. MCC replacement is an ideal time to add VFD control to motors that are currently full-voltage started. We size the drives, design the bypass contactor if required, address harmonic loading, and configure EtherNet/IP communication to your PLC. New MCC installations with integrated drives are cleaner and more maintainable than retrofit wall-mounted enclosures.

What is the arc flash situation with an aging MCC?

Aging MCCs often have higher arc flash incident energy than current standards would specify. Deteriorated bus connections, mis-coordinated fuses, and outdated protective device settings can all increase incident energy. New MCC installations with properly coordinated current-limiting fuses and zone-selective interlocking typically achieve significantly lower incident energy levels — sometimes reducing required PPE from Level 4 to Level 1 or 2.

What Allen-Bradley MCC product lines do you install?

Bulletin 2100 CENTERLINE 2100 — the standard NEMA-rated MCC lineup — in NEMA 1, Type 12, NEMA 4, and NEMA 4X configurations. We also install Bulletin 2500 low-voltage switchgear for applications requiring it.

What does manufacturing MCC replacement cost in Los Angeles?

Single-section MCC replacements in Los Angeles manufacturing facilities typically range from $35,000 to $90,000. Multi-section lineups range from $100,000 to $600,000 depending on size, VFD count, and site conditions. Fixed-price proposals after site walkdown and motor list review.

Get Started

Request a Project Quote

  • Fixed-price proposal after site walkdown
  • On-site throughout the project
  • All hardware sourcing coordinated
  • Full documentation at completion

Call (562) 396-9924

Tell Us About Your Project

We respond same day.

Ready to Get Started?

Fixed-price proposal. On-site Southern California. Call or submit the form — we respond same day.