Legacy PLC Migration · SLC-500 · PLC-5 · IE

Allen-Bradley Legacy PLC Migration
Inland Empire

The Inland Empire’s rapid industrial growth in the 1990s and 2000s installed a large base of Allen-Bradley legacy controllers across food processing, cold storage, distribution, and manufacturing — most of which have not been migrated. Rockwell discontinued the SLC-500 and PLC-5 in 2023. Every day on legacy hardware is risk that can be eliminated.

Fixed-price proposals
On-site IE
Studio 5000 certified

Request a Quote

Same-day response. Describe your project — we’ll schedule a walkdown and deliver a fixed-price proposal.

The Project

Allen-Bradley Legacy PLC Migration — Inland Empire

Direct Source migrates end-of-life Allen-Bradley PLC platforms — SLC-500, PLC-5, and MicroLogix — to current ControlLogix and CompactLogix systems for manufacturing, food processing, cold storage, and industrial facilities across Inland Empire. Full project scope, fixed-price proposals, on-site throughout.

SLC-500 Migration

SLC-500 to ControlLogix or CompactLogix migration for Inland Empire facilities — program conversion, I/O hardware replacement, panel modification, startup, and documentation. Fixed-price scope.

The most common legacy migration in Southern California manufacturing.

PLC-5 Migration

PLC-5 to ControlLogix migration in Inland Empire — including RIO to EtherNet/IP, DH+ network replacement, instruction set conversion, and SCADA reconnection. Complex projects with phased option available.

PLC-5 migrations require more engineering than SLC-500 — we scope them accurately.

MicroLogix Migration

MicroLogix 1000, 1100, 1200, 1400, and 1500 migration to CompactLogix. Standalone machines, packaging equipment, and process applications.

MicroLogix migrations are typically faster and lower cost than SLC or PLC-5 projects.

HMI & SCADA Migration

RSView32, PanelView Classic, and legacy SCADA systems migrated alongside the PLC. FactoryTalk View ME/SE, PanelView Plus, EtherNet/IP communication replacing legacy networks.

HMI migration is included in project scope from the start.

Emergency Migration

If your legacy PLC has already failed, we can mobilize fast in Inland Empire. Emergency migrations prioritize getting production running as quickly as possible.

Emergency availability is a key reason to establish a relationship before you need it.

Legacy PLC Assessment

We walk your Inland Empire facility, document every legacy controller, assess condition and parts availability, and deliver a written report with a prioritized migration roadmap and budget ranges.

Most facilities underestimate how many legacy controllers they have. The assessment finds them all.

Why Direct Source

What Makes Our Approach Different

All three legacy platforms in IE

SLC-500, PLC-5, and MicroLogix — we migrate all three in Inland Empire. Many contractors specialize in one. We have completed migrations across all Rockwell legacy platforms in Southern California.

Fixed-price migration projects

We scope migrations as fixed-price projects. Budget and approve before work starts. No open-ended hourly billing.

Minimal downtime approach

We pre-stage hardware, pre-convert programs, and pre-test before every cutover window. Most single-processor migrations cut over in one planned shift.

Inland Empire coverage

Ontario, Rancho Cucamonga, Fontana, Chino, Rialto, San Bernardino, Pomona, and all Inland Empire industrial cities. We serve the full Inland Empire industrial market on-site.

Every Project Includes

  • Site walkdown before proposal
  • Fixed-price project proposal
  • Hardware specification & procurement
  • On-site installation and startup
  • As-built documentation package
  • Post-startup support

Serving: Ontario, Rancho Cucamonga, Fontana, Chino, Rialto, San Bernardino, Pomona, and all Inland Empire industrial cities.

FAQ

Frequently Asked Questions

Which Allen-Bradley PLCs are end-of-life?

Rockwell Automation has discontinued: PLC-5 (all series), SLC-500 (all series including SLC-5/01 through 5/05), MicroLogix 1000 and 1100. The MicroLogix 1200, 1400, and 1500 are still supported but parts availability is declining. CompactLogix and ControlLogix are the current supported platforms.

What is the actual risk of staying on a legacy PLC?

The primary risk is an unplanned failure with no replacement hardware available. Secondary market stock of SLC-500 and PLC-5 hardware is depleting. A failed processor can mean weeks of downtime at current availability. The longer you wait, the harder parts are to find.

Can you assess our Inland Empire facility before we commit to migration?

Yes. We walk your facility, document every legacy controller and HMI, assess condition and parts risk, and deliver a written report with a prioritized migration roadmap and budget ranges. This gives you what you need to plan and budget before committing to a project.

Do you handle the entire project or just the programming?

We handle the full project: program conversion, hardware specification, panel modification, startup, commissioning, and documentation. We do not do programming-only engagements that leave you to handle hardware and startup separately.

What does legacy PLC migration cost in Inland Empire?

Migration costs vary by controller type and complexity. MicroLogix migrations typically range from $8,000 to $35,000. SLC-500 migrations range from $30,000 to $150,000. PLC-5 migrations range from $50,000 to $250,000. We provide fixed-price proposals after a site walkdown.

Get Started

Request a Project Quote

  • Fixed-price proposal after site walkdown
  • On-site throughout the project
  • All hardware sourcing coordinated
  • Full documentation at completion

Call (562) 396-9924

Tell Us About Your Project

We respond same day.

Ready to Get Started?

Fixed-price proposal. On-site Inland Empire. Call or submit the form — we respond same day.