Legacy PLC Migration · SLC-500 · PLC-5 · MicroLogix

Allen-Bradley Legacy PLC Migration
Southern California

Rockwell discontinued the SLC-500 and PLC-5 in 2023. MicroLogix 1000 and 1100 are end-of-life. If your facility is still running these platforms, the clock is running.

Fixed-price proposals
On-site SoCal
Studio 5000 certified

Request a Quote

Same-day response. Describe your project — we’ll schedule a walkdown and deliver a fixed-price proposal.

The Project

Allen-Bradley Legacy PLC Migration

Direct Source migrates end-of-life Allen-Bradley PLC platforms — SLC-500, PLC-5, MicroLogix — to current ControlLogix and CompactLogix systems for manufacturing, food processing, cold storage, oil and gas, and industrial facilities across Southern California.

SLC-500 Migration

SLC-500 to ControlLogix or CompactLogix migration — program conversion, I/O hardware replacement, panel modification, startup, and documentation. Fixed-price scope.

The most common legacy migration in Southern California manufacturing.

PLC-5 Migration

PLC-5 to ControlLogix migration including RIO to EtherNet/IP, DH+ network replacement, instruction set conversion, and SCADA reconnection. Complex projects with phased option available.

PLC-5 migrations require more engineering than SLC-500 — we scope them accurately.

MicroLogix Migration

MicroLogix 1000, 1100, 1200, and 1500 migration to CompactLogix. Smaller footprint machines, packaging equipment, and standalone control applications.

MicroLogix to CompactLogix migrations are typically faster and lower cost than SLC or PLC-5 projects.

HMI & SCADA Migration

RSView32, PanelView Classic, and legacy SCADA systems migrated alongside the PLC. FactoryTalk View ME/SE, PanelView Plus, and EtherNet/IP-based communication replacing legacy networks.

HMI migration is included in project scope — not treated as a separate afterthought.

Emergency Migration

If your legacy PLC has already failed, we can mobilize fast. Emergency migrations prioritize getting production running as quickly as possible — sometimes with a temporary solution while the full migration is completed.

Emergency migration availability is a key reason to establish a relationship with us before you need it.

Migration Assessment

Not sure where to start? We provide legacy PLC assessments: walk your facility, document every legacy controller, assess condition and risk, and deliver a prioritized migration roadmap with budget estimates.

Most facilities underestimate how many legacy controllers they have. The assessment finds them all.

Why Direct Source

What Makes Our Approach Different

All three legacy platforms

SLC-500, PLC-5, and MicroLogix — we migrate all three. Many contractors specialize in one. We have completed migrations across all Rockwell legacy platforms in Southern California.

Fixed-price migration projects

We scope migrations as fixed-price projects so you can budget and approve before work starts. No open-ended hourly billing that grows through the project.

Minimal downtime approach

We pre-stage hardware, pre-convert programs, and pre-test before every cutover window. Most single-processor migrations cut over in one planned shift. We do not accept multi-day unplanned outages as normal.

ISNetworld certified contractor

Direct Source is ISNetworld certified. We meet the safety and compliance requirements of manufacturing, oil and gas, and industrial facilities that require contractor certification.

Every Project Includes

  • Site walkdown before proposal
  • Fixed-price project proposal
  • Hardware specification & procurement coordination
  • On-site installation and startup
  • As-built documentation package
  • Post-startup support

Serving: Los Angeles, Orange County, Inland Empire, Riverside County, Long Beach, Vernon, City of Industry, Ontario, and all Southern California industrial markets.

FAQ

Frequently Asked Questions

Which Allen-Bradley PLCs are end-of-life?

Rockwell Automation has discontinued: PLC-5 (all series), SLC-500 (all series including SLC-5/01 through 5/05), MicroLogix 1000, MicroLogix 1100. The MicroLogix 1200, 1400, and 1500 are still supported but parts availability is declining. CompactLogix and ControlLogix are the current supported platforms.

What is the risk of staying on a legacy PLC?

The primary risk is an unplanned failure with no replacement hardware available. SLC-500 and PLC-5 processors, power supplies, and I/O cards are no longer manufactured. Secondary market stock is depleting. A failed processor can mean weeks of downtime at current availability. The longer you wait, the harder parts are to find.

Can you assess our facility before we commit to a migration?

Yes. We offer legacy PLC assessments: we walk your facility, document every legacy controller and HMI, assess condition and parts risk, and deliver a written report with a prioritized migration roadmap and budget ranges. This gives you the information to plan and budget before committing to a full project.

Do you handle the entire migration or just the programming?

We handle the full project: program analysis and conversion, hardware specification, panel modification or replacement, startup, commissioning, and documentation. We do not do programming-only engagements that leave you to handle hardware and startup separately.

Can we migrate during scheduled downtime rather than an emergency?

Yes — and that is always preferable. Planned migrations are faster, lower risk, and lower cost than emergency migrations. If your legacy PLC is still running, the right time to migrate is before it fails, not after.

Get Started

Request a Project Quote

  • Fixed-price proposal after site walkdown
  • On-site throughout the project
  • All hardware sourcing coordinated
  • Full documentation at completion

Call (562) 396-9924

Tell Us About Your Project

We respond same day.

Ready to Get Started?

Fixed-price proposal. On-site Southern California. Call or submit the form — we respond same day.