MCC Replacement · Bulletin 2100 · IE

Allen-Bradley MCC Replacement
Inland Empire

The Inland Empire’s cold storage, food processing, and logistics facilities house large MCC lineups controlling refrigeration compressors, conveyor motors, and process equipment. Many are aging Bulletin 2100 lineups that need replacement or major bucket-level upgrades. MCC replacement is a planned project — not something you want to do under emergency conditions after a bus failure or arc flash event.

Fixed-price proposals
On-site IE
Studio 5000 certified

Request a Quote

Same-day response. Describe your project — we’ll schedule a walkdown and deliver a fixed-price proposal.

The Project

Allen-Bradley MCC Replacement — Inland Empire

Direct Source designs and installs Allen-Bradley motor control center replacements for manufacturing, food processing, cold storage, and industrial facilities across Inland Empire. Full project scope: new MCC specification and procurement, power system coordination, installation, wiring, startup, and arc flash study coordination. Fixed-price proposals after a site walkdown.

MCC Specification & Procurement

We specify your replacement Allen-Bradley Bulletin 2100 MCC based on your motor list, load schedule, and existing distribution — full lineup design, bucket schedule, and factory order coordination for your Inland Empire facility.

We specify what you actually need — not oversized, not undersized.

Removal & Installation

Planned removal of existing MCC during scheduled outage: breaker transfer, disconnect, remove, position new MCC, land power feeders, reconnect branch circuits, and systematic re-energization.

Power feed coordination with your utility or facility distribution team is part of our scope.

Bucket & Component Replacement

Individual Allen-Bradley MCC bucket replacement — starter buckets, drive buckets, breaker sections — without replacing the entire lineup when the MCC structure is sound.

Bucket replacement is cost-effective when the lineup structure is in good condition.

Arc Flash Upgrade

Current-limiting fuse upgrade, zone-selective interlocking, arc flash energy reduction maintenance mode, and proper NFPA 70E labeling — reducing arc flash hazard at the new MCC.

Arc flash study updates are coordinated with qualified engineers when the new MCC changes incident energy at existing equipment.

NEMA 4X Washdown MCC

Stainless steel NEMA 4X MCC for food processing, beverage, and washdown environments. Fully gasketed, washdown-rated, configured for your specific application and sanitation requirements.

Food and beverage MCC replacement requires different materials and installation methods than standard manufacturing.

Startup & Motor Checkout

Motor-by-motor startup after MCC installation: meggering, rotation check, no-load run, and load verification for every motor reconnected to the new MCC. We do not energize and walk away.

Startup records and as-built documentation delivered at project completion.

Why Direct Source

What Makes Our Approach Different

Fixed-price MCC projects in IE

MCC replacement is a large project — you need to know the cost before approving it. We provide fixed-price proposals for Inland Empire MCC projects after a site walkdown and existing panel review.

We coordinate the full project scope

Rockwell factory order, delivery coordination, power shutdown scheduling, installation, wiring, startup — one contractor managing the complete scope. You do not manage separate vendors for each phase.

Inland Empire industrial experience

We have replaced MCCs in Inland Empire food processing, cold storage, manufacturing, and industrial facilities. We know the access requirements, shutdown coordination, and inspection requirements in the area.

Emergency bucket replacement

If an MCC bucket fails, we respond fast. We carry common Allen-Bradley replacement buckets and components for emergency response alongside planned replacement projects.

Every Project Includes

  • Site walkdown before proposal
  • Fixed-price project proposal
  • Hardware specification & procurement
  • On-site installation and startup
  • As-built documentation package
  • Post-startup support

Serving: Ontario, Rancho Cucamonga, Fontana, Chino, Rialto, Pomona, and surrounding Inland Empire industrial facilities.

FAQ

Frequently Asked Questions

How long does an MCC replacement take?

A single-section MCC replacement typically takes 1–3 days for installation and startup. Multi-section lineups take longer. The majority of project time is preparation — specification, procurement, and pre-staging. The installation window is minimized with proper planning.

Replace the full MCC or just the buckets?

Both options are available. Individual bucket replacement is cost-effective when the MCC structure is sound. Full replacement makes sense when the bus is deteriorated, the structure is damaged, or you need additional capacity. We assess this during the site walkdown.

Do you coordinate the arc flash study update?

MCC replacement often changes the arc flash incident energy at the equipment. We coordinate with qualified arc flash study engineers to ensure the new MCC’s protection coordination is properly documented and equipment is labeled correctly after replacement.

What does MCC replacement cost in Inland Empire?

MCC replacement costs vary by size, section count, and site conditions. Single-section replacements in Inland Empire typically range from $30,000 to $80,000. Multi-section lineups range from $100,000 to $500,000+. We provide fixed-price proposals.

Can you replace buckets while the MCC is energized?

Some bucket replacement work can be performed with the MCC lineup energized if the bus is properly isolated — this depends on the specific MCC design and your facility’s safety requirements. We assess this during the project planning phase.

Get Started

Request a Project Quote

  • Fixed-price proposal after site walkdown
  • On-site throughout the project
  • All hardware sourcing coordinated
  • Full documentation at completion

Call (562) 396-9924

Tell Us About Your Project

We respond same day.

Ready to Get Started?

Fixed-price proposal. On-site Inland Empire. Call or submit the form — we respond same day.