End-of-Life PLC Risk Assessment
Southern California
Most facilities underestimate how many legacy PLCs they have — and how close any one of them is to a failure that takes down production for weeks.
On-site SoCal
Studio 5000 certified
Request a Quote
Same-day response. Describe your project — we’ll schedule a walkdown and deliver a fixed-price proposal.
The Project
End-of-Life PLC Risk Assessment
Direct Source performs legacy PLC risk assessments for manufacturing, food processing, cold storage, oil and gas, and industrial facilities across Southern California. We walk your facility, document every Allen-Bradley legacy controller, assess condition and parts availability, and deliver a written report with a prioritized migration roadmap and budget ranges.
Facility Walkdown & Inventory
We walk every area of your facility and document every PLC, HMI, and control panel — model, series, firmware version, I/O count, network type, condition, and production criticality.
Most facilities have legacy controllers they have forgotten about or never formally inventoried.
Parts Availability Assessment
For each identified legacy controller, we assess current parts availability: processor, power supply, and I/O card availability from Rockwell and secondary market sources, and lead times at current availability.
Parts availability changes fast — what was findable six months ago may not be findable today.
Failure Risk Scoring
Each controller is scored for failure risk: age, condition, duty cycle, parts availability, and production impact of failure. High-risk controllers are prioritized for immediate migration planning.
Not all legacy PLCs carry the same risk — the assessment tells you where to focus first.
Migration Roadmap
Written prioritized migration roadmap: controllers ranked by risk, recommended replacement platform for each, estimated project scope, and budget ranges. Gives you what you need to plan and budget.
The roadmap is written for both maintenance/engineering staff and management — two different audiences, one document.
Program Backup & Archive
During the assessment, we back up every legacy program we can access. If a controller fails before migration, you have the program — not just a dead controller with no documentation.
Program backups from legacy systems are often missing or outdated. We update them during the assessment.
Assessment Report Delivery
Written assessment report delivered within 5 business days of site walkdown: full controller inventory, risk scores, parts availability summary, migration roadmap, and executive summary for management review.
The report is yours to keep and use — we do not hold it as a sales tool.
Why Direct Source
What Makes Our Approach Different
Independent assessment — not a sales pitch
The assessment report gives you accurate information about your legacy PLC risk. We include honest recommendations about which controllers to migrate first, which can wait, and which are lower risk than they appear.
We find the ones you forgot
Standalone machines, remote pump stations, utility systems, and lab equipment often have PLCs that maintenance has not touched in years. We find them all.
Program backup included
Every accessible legacy program is backed up during the assessment. This protects you immediately — before any migration project starts.
Leads directly to budgeted migration projects
The assessment delivers the information you need to get migration projects budgeted and approved. Fixed-price migration proposals for any identified controllers are available immediately after assessment delivery.
Every Project Includes
- Site walkdown before proposal
- Fixed-price project proposal
- Hardware specification & procurement coordination
- On-site installation and startup
- As-built documentation package
- Post-startup support
Serving: Los Angeles, Orange County, Inland Empire, Riverside County, Ventura County, and all Southern California industrial markets.
FAQ
Frequently Asked Questions
What does a legacy PLC assessment involve?
We schedule a site walkdown (typically one day for most facilities), visit every production area, document every PLC and HMI we find, photograph hardware, attempt to back up programs, and note condition and production criticality. The written report is delivered within 5 business days.
Do I need to prepare anything before the assessment?
Basic preparation helps: a floor plan or area list, existing panel documentation if available, and access to all production areas and utility rooms. We do not require complete documentation — finding undocumented systems is part of what the assessment does.
What does the assessment cost?
Legacy PLC assessments for most Southern California facilities range from $2,000 to $6,000 depending on facility size and number of areas. We apply the assessment cost toward any migration projects that follow.
What if we already know which PLCs need to be migrated?
If you have already identified the controllers to migrate, we can skip directly to a migration proposal. The assessment is most valuable when the full inventory is unknown or the risk ranking is unclear.
How long has the SLC-500 been discontinued?
Rockwell Automation announced the end-of-life transition for the SLC-500 and PLC-5 platforms starting in 2020, with final discontinuation in 2023. No new SLC-500 or PLC-5 hardware has been manufactured since that date.
Get Started
Request a Project Quote
- Fixed-price proposal after site walkdown
- On-site throughout the project
- All hardware sourcing coordinated
- Full documentation at completion
Tell Us About Your Project
We respond same day.
Ready to Get Started?
Fixed-price proposal. On-site Southern California. Call or submit the form — we respond same day.