LA Basin · Pump Jack Specialist · ISNetworld

Pump Jack Electrical Contractor
Los Angeles Basin

Pump-off at 2 AM? We answer after hours and dispatch the same day. ISNetworld pre-qualified, Class I Division 2 certified, 30+ years of pump jack electrical service across LA Basin urban oilfields.

ISNetworld Pre-QualifiedClass I Division 224/7 Emergency Dispatch

Get a Same-Day Consultation

Fast response guaranteed. Tell us about your operation — we’ll call you back today.

Oilfield Emergency? Don’t fill out a form.
Call (562) 396-9924

Licensed, Bonded & Insured
CA C10 · LIC # 1008512

OSHA Compliant
Safety-first on every job
ISNetworld Member

ISNetworld Member
Safety & compliance verified

Trusted by industry leaders

Direct Source serves Southern California’s top operators

Certex
Vorteq
E&B Natural Resources
Foster Farms
Fenner Precision Polymers
Warren Resources
Koch Finishing Systems

How It Works

From First Call to Fixed — Fast

We cut out the back-and-forth. You call, we respond same day, you get a straight answer on what it costs and how long it takes. No runaround.

STEP 1

Call or Submit

Tell us what’s down or what you need. A real person responds — fast.

STEP 2

Same-Day Response

We get eyes on your equipment today — phone or on-site at your production facility.

STEP 3

Clear Plan & Pricing

Straight answers on scope, timeline, and cost — no surprises.

STEP 4

We Fix It

Our own ISNetworld-qualified crews do the work — electrical, controls, and automation.

Our Services

Oilfield Electrical Services We Provide

ISNetworld pre-qualified crew — Class I Division 2 certified for active production areas.

Motor Starter Replacement

Full motor starter replacement and repair for sucker rod pump units — NEMA starters, soft starters, and across-the-line controls for LA Basin pump jacks.

VFD Retrofit & Installation

Variable frequency drive installation on pump jack motors to reduce wear, improve efficiency, and give operators speed control across LA Basin production sites.

Control Panel Troubleshooting

Pump controller diagnostics and repair — pump-off controllers, time clocks, and surface control units for sucker rod pumping systems.

Pump-Off Controller (POC) Service

Installation and maintenance of pump-off controllers including Lufkin SAM, Weatherford LOWIS, and other common POC systems.

Motor Replacement & Rewiring

Pump jack motor replacement, conductor sizing, and wiring from transformer or panel to motor for production wells throughout the LA Basin.

Hazardous Location Compliance

All pump jack electrical work performed to Class I Division 2 standards per NFPA 70 — explosion-proof fittings, sealed conduit, and compliant equipment.

Why Direct Source IS

The Oilfield Contractor Independent Operators Choose

30+ Years Pump Jack Service

Decades of experience with sucker rod pump units across LA Basin urban oilfields — from single wells to full-field electrical maintenance programs.

24/7 Emergency Dispatch

Pump-off means lost production. We answer after hours and dispatch same-day for emergency motor, starter, and controller failures.

ISNetworld Pre-Qualified

Already approved — no onboarding delays. We meet the compliance requirements of independent operators across the LA Basin.

Class I Division 2 Trained

All pump jack electrical work performed to Class I Div 2 standards. We know what compliant looks like in active production zones.

Direct Source oilfield electrical crew

Direct Source by the Numbers

30+
Years pump jack service
24/7
Emergency response
Class I
Div 2 Certified

Direct Source service truck
Oilfield electrical panel installation
Industrial electrical work at height
Direct Source crew at oilfield facility

Get Started

Request Your Same-Day Consultation

  • A real response today — not a callback queue
  • ISNetworld pre-qualified — no contractor approval delay
  • Class I Division 2 certified crew for classified areas
  • 24/7 emergency response for production outages

Emergency Dispatch: (562) 396-9924

FAQ

Frequently Asked Questions

What pump jack electrical services do you offer?
Motor starter replacement, VFD retrofits, pump-off controller installation and repair, motor replacement, control panel troubleshooting, and 24/7 emergency response for pump-off conditions.
Do you work with pump-off controllers (POC)?
Yes — we install and service pump-off controllers including Lufkin SAM, Weatherford LOWIS, and other common POC systems used in LA Basin production.
Can you respond to a pump failure after hours?
Yes. We provide 24/7 emergency response for pump-off conditions and dispatch the same night for critical production outages across the LA Basin.
Are you ISNetworld pre-qualified?
Yes — fully pre-qualified with OSHA 30, confined space, hot work, and insurance documentation current. No delays on contractor approval.
Do you perform Class I Division 2 electrical work at pump sites?
Yes. All pump jack electrical work is performed to Class I Division 2 standards per NFPA 70 — explosion-proof fittings, sealed conduit entries, and compliant equipment.

Pump-Off? We’ll Dispatch Today.

ISNetworld pre-qualified and ready to mobilize. Fill out the form above or call for emergency dispatch.